The challenge

What the project demanded.

The design combined roads, bus stops and an underground network for multiple services, with sustainability and future infrastructure needs central to the presentation.

WastuViz scope

  • Road design visualisation
  • Bus-stop presentation
  • Underground utility communication
  • Sustainability-focused stakeholder material

Working approach

  • Clarified the relationship between surface and underground systems
  • Prioritised legibility for non-technical stakeholders
  • Kept environmental considerations visible
  • Compressed production without dropping the review structure

Delivery context

What the work established.

The rendering was completed in less than half the initially agreed production time and was appreciated by the project stakeholders.

Related work

More from Public Infrastructure.

All work
Aerial view of the MMRDA Sahar Elevated Road corridor beside Mumbai airport

Public infrastructure visualisation

MMRDA Sahar Elevated Road Project

Visual development for the MMRDA Sahar Elevated Road Project, undertaken with Milan Road Buildtech to support clear stakeholder communication.

Open case study

Project enquiry

Discuss a related project

Discuss a Project